中文字幕一区二区三区日韩精品,香蕉久久国产AV一区二区,狠狠色婷婷久久一区二区三区,free性玩弄少妇hd

Shopping Cart
Global Site
Hengli America InLine Hydraulik Hattori Seiko Lixin Hydraulics Hengli Pneumatic Harada Seal
Language
簡體中文 Deutsch Fran?ais Italiano 日本語 Русский язык Espa?ol Português
Close

Online message

If you have any needs, please leave a message and we will contact you as soon as possible。

Hengli helps the world's largest piling equipment to start a new journey of dark blue

Information


   global Highlights

    --

Global News




The world's largest

the world's most

image

        

        on January 5, 2025, invested by China Communications Second Aviation Bureau and built by Shanghai Zhenhua Heavy Industry, the "Second Aviation Changqing" piling equipment was successfully delivered in Qidong, Jiangsu Province.. As the piling equipment with the highest pile frame, the largest lifting capacity, the longest pile length and the strongest wind and wave resistance in the world, its delivery marks a new milestone in the field of marine engineering equipment manufacturing in China.

It is reported that the piling equipment has a total length of 130.5 meters, a type width of 40.8 meters, a type depth of 8.4 meters, and a pile frame height of 150 meters. The Main hydraulic cylinder thrust5000 tons, the world's largest hydraulic cylinder. The hydraulic cylinder is matched by Hengli, weighing 385 tons, with a cylinder diameter of 1.6 meters, a stroke of 21 meters and a total length of 28 meters..                    

        The manufacturing road of this world record-breaking "big cylinder" is not ordinary. Hengli team bravely took up the challenge and faced the difficulties. Through comprehensive analysis, rigorous design and investment in the blessing of the newly-built super-large hydraulic cylinder supporting production line, A number of key technological breakthroughs have been achieved in the structural design of large and heavy hydraulic cylinders and special processing techniques.. In particular, it successfully overcomes the problem of high-speed cladding application on large rods and greatly improves the reliability and service life of the product.

        In the construction of the project piling equipment, Hengli hydraulic system engineers also went to the site, participate in forward tilt, backward tilt and load test of pile frame. In the difficult test process, they braved the bitter river wind and paid close attention to various data comprehensively and carefully to realize the micro-speed control required for oil cylinder hinge changing, centering and pin changing, with the accuracy reaching millimeter level. The "luffing and reaming" of the pile frame of the auxiliary pile driving equipment is completed efficiently, accurately and safely.

主站蜘蛛池模板: 安图县| 郑州市| 霍州市| 札达县| 滦南县| 涿州市| 辉南县| 札达县| 天等县| 大埔县| 云阳县| 永吉县| 台前县| 宝清县| 自治县| 讷河市| 金乡县| 福安市| 绿春县| 香港| 留坝县| 神农架林区| 尉犁县| 肇源县| 敖汉旗| 兴化市| 吉水县| 临颍县| 邓州市| 泗阳县| 社会| 故城县| 盐边县| 绵竹市| 社旗县| 南阳市| 辽中县| 台安县| 克拉玛依市| 苏尼特右旗| 黑河市|